Littlefield Technologies
Littlefield Simulation1

Team Synergy discussed our strategy for the Littlefield Simulation. Following is the timeline summarizing the decisions we made and the justification for those decisions.
Day 50 – Bought machine for Station 1
When we first evaluated our factory, we noticed from days 1 to 50, the bottleneck was mainly Station 1. Most days, however, we were able to make our $1000 revenue. Therefore, our team decided that buying another machine for Station 1 would help move the bottleneck and meet our 24 hour quoted time for completing and shipping receivers.
Day 97 – Changed Station 2 scheduling rule to priority step 2
From days 51 to 97, we noticed the bottleneck occurred at all stations, depending on how many new kits were coming in. As a team, we decided that we would not purchase another machine at this time, but change how Station 2 was processing its’ queue. Station 2 was set to FIFO, but we decided that by changing the scheduling rule to priority step 2, we could process all the incoming kits, giving priority to the short initial tests, which would then enable an even flow of kits to Station 3. At this time, we were in third place in the overall standings and wanted to maintain that ranking if possible.
Day 132 – Changed Station 2 scheduling rule to priority step 4
From days 98 to 132, our overall standing improved from third to first place and we were happy with our decision. At this time, however, we started seeing 100% utilization at both Stations 1 and 2. We decided we could not maintain our first place standing if we did not do something. At this point, we made the decision to move the scheduling rule at Station 2 to priority step 4, as we started to see revenues drop drastically and hoped that by prioritizing the longer final testing process, we could improve the throughput of the kits. Day 150 – Bought machine for Station

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Finally, on day 150 we try an “all in” strategy spending $160.000 in 1 machine for station 1 and 2 to increase the capacity and to process jobs only on conditions of contract 3. This decision was taken based on a demand of 91 jobs and a utilization of station 1 of 0.83 between days 143 and…

    • 855 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Lt Game

    • 384 Words
    • 2 Pages

    When we decided to purchase machine for three stations on day 66, we calculated the capacity rate for each station. We knew that we late for other groups for purchasing machine already. Then we saw the rank of team, we feel worry about the rank. So we decided purchase machine right now. Station 1 has the lowest capacity rate, and already saturation for one machine. And it has the most jobs waiting in the buffer, so we bought it first to see if whether it will get better or not. After one hours which is on the day 67 of the Game, when we had our group meeting, we found that the data is not change, so that mean we should add more machine in station 1. We decided to purchase 2 machines station 1 again totally 4 machines, because it has the closest full capacity rate compares to other two machines.…

    • 384 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Identify what were the problems with performance and what would be your solutions to this issue?…

    • 704 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    M3.01 Problem Solving

    • 1592 Words
    • 7 Pages

    One of the production converting machines was not performing to the required run rate per hour and was constantly behind its production capability putting pressure on the business to meet tight customer demands. The impact of this was that the machine was only producing at an average run rate of 1700 boards per hour against a target of 2000 boards per hour and producing at a 90% customer delivery rate. The product due to be converted on this machine was constantly having to be switched to other machines to ensure customer deliveries.…

    • 1592 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    4. At the beginning of the year, factory overhead application rates were based on the following data:…

    • 2559 Words
    • 11 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Weekly Report Sample

    • 426 Words
    • 2 Pages

    - We have 8 rats that will be performing on S1b schedule (1st Schedule in the 5 Choice training) tomorrow. 4 rats are bumped up to S2b schedule while 2 rats are on S3b Schedule.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The machines from Guarulhos were stated to be more reliable than the current machines in Jaboatão. A partly or a complete takeover of these machines would allow to adapt to the needed capacity. Unused machines could be sold.…

    • 1193 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Management’s main concern is managing the capacity of the lab in response to the complex demand pattern predicted. Delays resulting from insufficient capacity would undermine LL’s promised lead times and ultimately force LL turn away orders.…

    • 1089 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Goal Report

    • 645 Words
    • 3 Pages

    The bottleneck is defined as the resource such that the capacity is equal to, or less than the demand placed on it. To identify the bottleneck for this particular case, those processes were analyzed after which there is usually a shortage of material…

    • 645 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Towards the last days, we realized that focus change operation on station two turned down a mistake and we began to lose production productivity which caused by excessive supply from station three. Therefore, station two’s utilization became insufficient and we started to delay our deliveries which caused loss by contract. Reacting lately on the situation, we lost big amount of money and changed our station two’s main focus to a balanced level between board stuffing and tuning. Lately, we couldn’t generate more profit than our competitors and we reacted lately towards situations. Also, we find out that changes in delivery time cost us more than what we generated from…

    • 441 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Pinto Pm2 Ism Ch10 1

    • 3754 Words
    • 21 Pages

    INSTRUCTOR’S RESOURCE MANUAL CHAPTER TEN Project Scheduling: Lagging, Crashing, and Activity Networks To Accompany PROJECT MANAGEMENT: Achieving Competitive Advantage By Jeffrey K. Pinto CHAPTER 10 PROJECT FOCUS – A Crushing Issue: How to Destroy Brand New Cars INTRODUCTION 10.1 LAGS IN PRECEDENCE RELATIONSHIPS…

    • 3754 Words
    • 21 Pages
    Satisfactory Essays
  • Good Essays

    Texas instruments

    • 807 Words
    • 3 Pages

    Reduce cycle time: The most important thing that TI needs to accomplish is that it needs to reduce the cycle time, which will eventually bring down the labor cost per unit. The cycle time can be reduced to 18 seconds by appropriately adding more workers for certain operations (explained in Appendix 1). This would…

    • 807 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Donner Company

    • 1456 Words
    • 6 Pages

    Another thing that needs to be done is a physical tracking of the actual throughput time for a board in the system. The numbers provided in the analysis are only as good as their inputs, therefore improved figures on timing would allow the company to provide better delivery time estimates. As it stands, a maximum of ~1200 boards can be produced during a week. An order queue can build up after that, and the length would help determine delivery times in providing estimates. Rush orders should be charged a premium because of the interruption of…

    • 1456 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Heinz Case

    • 12224 Words
    • 49 Pages

    1. Our batch sizes for both setups and quality inspection were smaller than planned. Even though we were able to reduce the setup and quality inspection time needed for each batch (because of the smaller batch sizes), these gains were more than offset by the increased number of batches. Overall, we ended up substantially below the level of efficiency at which we wished to operate.…

    • 12224 Words
    • 49 Pages
    Powerful Essays
  • Satisfactory Essays

    employees on 6 machines for the final inspection, the end of the process should not take as…

    • 288 Words
    • 2 Pages
    Satisfactory Essays