Preview

Proposal on Past Performance

Good Essays
Open Document
Open Document
1225 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Proposal on Past Performance
BACKGROUND OF THE STUDY
The last decade however exposed the declining level of client’s satisfaction from the built facilities as a result of poor quality performance in addition to the perennial problem of time and cost overrun ( Arazi and Sodangi). Xiaohang 2011 explained that construction contractors have big influence upon project and their success. There are many main contractors’ selection criteria that can be found in literatures, but in real practice, clients may have their different criteria (Arazi et al, 2011). (Olatunji, 2007) said most of the models of assessment used for the selection of contractors are not based on value and merits of bids, but on the tender price as well as the “initial” lowest bids. It was discovered that the continual award of contracts based on the lowest tender figure under the “Due process” policy as against the lowest realistic tender figure is the major factor causing time overrun and poor quality construction in Nigeria (Aje et al, 2008).
Traditionally, the majority of construction contracts have been awarded using the low bid process (United State department of Transport, 2012). (William 1998) stated that Contracting agencies have long been required to consider past performance information concerning an offeror in determining whether he or she is qualified to perform the contract as a responsible contractor. Also, (Steyaert 1997) explained that the contractor’s past performance record is arguably the key indicator for predicting future performance. As such, it is to the government to make use of past performance in evaluating and selection of contractors for the award of contract.
(AcQuipedia encyclopedia) defined past performance Information as a relevant information for source selection purposes regarding a contractor’s action under previously awarded contract. (Kashiwagi et al, 2008) explained that, in construction, the perception exist that, though performance information is collected, it is lacking substantial



References: 1. Steyaert, J (1997) White Paper Past Performance, U.S. General Services Administration. Retrieved February, 2013, from http://www.acqsolinc.com/pastperfdoc/pastperfwp.html 2. A guide to collection and use of past performance information (version 3) Retreived February, 3013, from Retreived on February, 2012, from www.civil.neduet.edu.pk/ICCIDC-I/Conference%20Proceedings/.../034.pdf 6. Arazi Idrus, Mahmoud Sodangi and Mohamad Afeq Amran (2001), “Decision Criteria for Selecting Main Contractors in Malaysia”, Research Journal of Applied Sciences, Engineering and Technology 3(12), Maxwell Scientific Organization, 2011, pp 1358-1365. 7. William T. Woods(2007), “Use of Contractor Performance Information”, , United States Government Accountability Office. Retreived February, 2012, from www.gao.gov/new.items/d071111t.pdf 8. Kenneth T. Sullivan and John Savicky(2010), “Past Performance Information: Analysis of the Optimization of a Performance Evaluation Criteria” Journal for the Advancement of Performance Information and Value, pp 13-22. 9. Definition of Past performance Retrieved on February, 2012, from FEDERAL UNIVERSITY OF TECHNOLOGY, MINNA FEBRUARY, 2013

You May Also Find These Documents Helpful

  • Satisfactory Essays

    leg 440 discussion week 2

    • 503 Words
    • 3 Pages

    Selection of sources for Architect-Engineer contracts in accordance with the provisions of 40 U.S.C. 1102…

    • 503 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    a discussion on the criteria which would have been used to select the procurement strategy / building contract.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Good Essays

    The company's relationship with contractors is predominately transactional in nature where construction work is tendered and bid on a competitive basis. Work is primarily awarded based on lowest cost with some consideration for…

    • 612 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Lai, I. K. W., & Lam, F. K. S. (2010). Perception of various performance criteria by stakeholders…

    • 888 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Penny Store

    • 1251 Words
    • 6 Pages

    Qualification: Based on the experience of contractor’s team will be awarded 5 points. This also involve other factors which indicates which team is…

    • 1251 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    References: Flanagan, J.C. and R.K. Bums. "The Employee Performance Record: A New Appraisal and Development Tool." Harvard Business Review. Sept./Oct. 1955.…

    • 2889 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    1. INTRODUCTION Subcontractors could contribute to as much as 90% of the total project value (Matthews et al, 1997), and the performance of subcontractors could inevitably affect…

    • 1500 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    LAI, I. K. W. (2010). Perception of Various performance criteria by stateholders in the construction sector in Hong kong.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    References: Bennett. J., and Grice, T. (1990). ‘Procurement Systems for Building’ Quantity Surveying Techniques - New Directors, (Ed. Brandon, P.S.). Blackwell Scientific Publications, London. pp 243-262. ELSIE System, (1990). Imaginor System, RICS QS Division. Gillespie, B. (1994). ‘The Choice of Procurement Route is A Key Decision - So why not treat it as one?’ Building, 29 July. p.46. Hughes, W., and Djebarni, R. ‘A Preliminary Survey of Attitudes to UK Construction Procurement Practice’. Unpublished paper. University of Reading & University of Glamorgan. Latham, Michael, (1994). Constructing the Team, Final Report of the Government/Industry Review of Procurement and Contractual Arrangements in the UK Construction Industry, HMSO, London. Masterman, J.W.E. (1992). An Introduction to Building Procurement Systems. E. & F.N. Spon, London. McCanlis, E.W. (1967) Tendering and Contractual Arrangements, Research and Information Group of the Quantity Surveyors’ Committee, RICS, London. Morledge R., and Sharif A. (1996,a). ‘The Procurement Guide’ A Code of Procedure for Builders and their Advisers. RICS, London. Morledge R., and Sharif A. (1996,b). ‘Strategies for Procurement: Implications for Cost Database, Cost Planning and Tender Price Indexing’ COBRA 95-Construction and Building Conference -, RICS, London. NEDO (1985)., ‘Thinking about building - a successful business consumer’s guide to using the construction industry’, Building Economic Development Committee, London. Peak, J.H., Lee, Y.W., and Napier, T.R. (1992). ‘Selection of Design/Build Proposal Using Fuzzy-Logic System’ Journal of Construction Engineering and Management, 118, pp 303-317. Rowlinson, S.M., and Newcombe, R. (1984). ‘Comparison of Procurement Forms for Industrial Buildings in the UK’ The 4th International Symposium on Organisation and Management of Construction, University of Ontario, Canada.…

    • 2557 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    © Crown copyright 1994 Applications for reproduction should be made to HMSO First published 1994…

    • 52860 Words
    • 212 Pages
    Good Essays
  • Best Essays

    While corruption can take place in any phase of the contracting process, it seems to be most prevalent during the evaluation phase because this is the time that potential bids are analyzed in order to select the most appropriate contractor, but the risks are not limited to this phase alone. Corruption can occur even before a contracting process starts, when decisions are made about what to contract because some project rewards start off allocated to a specific contractor. Furthermore, there is also opportunity for abuse once the contracting process has finished and the contractor has been selected. This can include a lack of performance, wanting to renegotiate contracts, over-billing the…

    • 4590 Words
    • 19 Pages
    Best Essays
  • Good Essays

    Performance Appraisals

    • 983 Words
    • 4 Pages

    When doing anything meaningful, humans have a natural desire to know how they are performing. In particular, if they are doing a job, they need to know if they are doing horrible, great, or somewhere in between. One of the best potential ways of providing this feedback is through the use of performance appraisals. By definition, “performance appraisal is the process through which employee performance is assessed, feedback is provided to the employee, and corrective action plans are designed.” (Youssef, 2012) If properly designed and administered, a performance appraisal can provide a great benefit to the employee, supervisor, and the company itself; however, one must be careful when giving appraisals. Bias, whether intentional or unintentional, can be detrimental at all levels. Though it may seem simple, there are a variety of implications with the entire appraisal systems. There are strategic advantages of performance appraisals, forms of bias within these appraisals, and effects on the achievement of strategic objectives from appraisals.…

    • 983 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Managing risks in construction projects has been recognised as a very important management process in order to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. However, until now most research has focused on some aspects of construction risk management rather than using a systematic and holistic approach to identify risks and analyse the likelihood of occurrence and impacts of these risks. This paper aims to identify and analyse the risks associated with the development of construction projects from project stakeholder and life cycle perspectives. Postal questionnaire surveys were used to collect data. Based on a comprehensive assessment of the likelihood of occurrence and their impacts on the project objectives, this paper identifies twenty major risk factors. This research found that these risks are mainly related to (in ranking) contractors, clients and designers, with few related to government bodies, subcontractors/suppliers and external issue s. Among them, “tight project schedule ” is recognised to influence all project objectives maximally, whereas “design variations ”, “excessive approval procedures in administrative government departments”, “high performance/quality expectation”, “unsuitable construction program planning”, as well as “variations of construction program” are deemed to impact at least four aspects of project objectives. This research also found that these risks spread through the whole project life cycle and many risks occur at more than one phase,…

    • 6650 Words
    • 27 Pages
    Powerful Essays
  • Good Essays

    Program Evaluations

    • 365 Words
    • 2 Pages

    Program evaluations primary purpose is to improve teaching and learning. There are four levels of evaluation required in order to successfully assess the program…

    • 365 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    The Government has long realized problems facing parties to construction contracts in securing regular and timely payment that impacts cash flow during project implementation. In ensuring the smooth implementation of construction projects, problems of this nature must be addressed especially at the onset of the 10th Malaysia Plan.…

    • 376 Words
    • 2 Pages
    Satisfactory Essays