Ron Engineering Case Summary
MJB
Introduction:
Bid for tender was requested by Defense Construction to construct a water pump, and distribution system. Important specifications for tender were a lump sum price, and would submitted a unit price for the construction of the distribution system. Four bids were collected. The contract was awarded to the lowest bid, Sorochan Enterprises Ltd.
Issues:
Does the statement of privilege allow the owner to choose a bid other than the lowest even if it breaches the terms of the tender? Facts:
One of the tender documents was that the lowest bid or tender shall not necessarily be accepted.
There were multiple types of materials that could be used for the sub grade for installing the pipe, and the owner wanted to see only a single
…show more content…
Defense Construction declared that it was just a clarification and accepted the bid.
Analysis
The appellant used the Ron Engineering, Supra case to conclude that there was a contracted formed between the owner and each of the tenderers. The contract was Contract A. Since there was a formal contract introduced, the breach by Sorochan Enterprises Ltd. for introducing a stipulation for their bid, in the form of an additional charge, and because Defense Construction accepted this non-compliant bid, the Contract A between the other tenderers was broken.
The appellant argues that because there was a formal invitation to submit a tender for a project, the rules and regulations set forth by Canadian Construction Documents Committee Guide to Calling Bids and Awarding Contracts are applied for this scenario. In order for this to have merit, a statement from M.J.B Enterprises, supra. stating,
“We certify that Tenders for trades named under (a) and (b) below were received through the Alberta Bid Depository Ltd., ... in accordance with the Standard Rules of Practice for Bid Depositories (Federal Government Projects) as required by this

You May Also Find These Documents Helpful

  • Powerful Essays

    When a procuring agency fails to adhere to the regulations and/or the terms listed within the solicitation, a bid protest may be filed (Nacke & Ralston 2011). A bid protest is a tool that a contractor can use to legally contest the process or result of a government contract award. In order to file a protest, one must be considered an interested party, meaning they are an offeror or prospective offeror who would be financially affected by either the award or the non-award of the contract. There are three different types of protests available to contractors. Each has differing procedures but they share the main requirement; In order to win, they must provide supporting information which would prove that they have been prejudiced by the government agency. The two most common forms of bid protest are the agency-level protest and the Government Accountability Office (“Bid Protests,” 2010).…

    • 4029 Words
    • 17 Pages
    Powerful Essays
  • Powerful Essays

    Case 8 Rfq

    • 2161 Words
    • 9 Pages

    The subject materials have been selected for competitive bid, the RFQ has been issued, and responses from nine potential vendors have been collected. The variations in the bid responses are staggering, causing concern for the validity of the RFQ process. Should we decide to proceed with the lowest bidder, we would do so at our own risk, as the bidder may not have understood the requirements of fulfilling the contract. I propose that we re-evaluate the RFQ documents to ensure that the bidders have a consistent understanding of the Statement of Work. This is the best way to offer our company the value created by the competitive bid process.…

    • 2161 Words
    • 9 Pages
    Powerful Essays
  • Best Essays

    Peter Smythe V Thomas

    • 2716 Words
    • 11 Pages

    The justice also found that the defendants claim to only have created an invitation to treat was unjustified on the grounds that the bid met the time period, the minimum bid, the plaintiff was the highest bidder and didn 't impose a qualification on the bid. It is for these reasons that the judge found a binding contract between the buyer and vendor and henceforth implemented an order for specific performance, instructing the contract to be…

    • 2716 Words
    • 11 Pages
    Best Essays
  • Good Essays

    Part 14 Sealed Bidding; Part 15 Contracting by Negotiation; Subpart 6.2—Full and Open Competition After Exclusion of Sources;Subpart 6.4—Sealed Bidding and Competitive Proposals…

    • 928 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Tercon Case Summary

    • 501 Words
    • 3 Pages

    Certainties:- The BC Ministry of Transportation and Highway issued a demand for proposal(RFP) for the development of a Highway. Six groups reacted with accommodation including Tercon and Brentwood Enterprises Ltd. Soon thereafter, the territory educated the six advocates that it now planned to outline the roadway itself and issued a demand for recommendations for its development. The RFP likewise incorporated a statement barring all cases for harms "because of taking an interest in this RFP" (s. 2.10). Brentwood gone into a pre-offering concurrence with another development organization ("EAC") which was not a qualified bidder to embrace the work as a joint wander. Eventually Brentwood presented an offered in its own name with EAC recorded as a "noteworthy part" of the group .Brentwood and Tercon were the two short-recorded defenders and the Province chose Brentwood for the venture. Tercon got an activity harms against the area.…

    • 501 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    a discussion on the criteria which would have been used to select the procurement strategy / building contract.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Better Essays

    2) Pressure from leadership. Interagency politics and lack of planning resulted in this procurement being somewhat rushed. Current year funds expiring and senior manager eagerness are not appropriate factors to force a contract specialist to consider.…

    • 1374 Words
    • 4 Pages
    Better Essays
  • Better Essays

    Ces2 Reflection

    • 905 Words
    • 4 Pages

    The purpose of the RFP was to replace the existing course on the Commission on Peace Officer Standards and Training (POST) learning portal. I was assigned and challenged to finalize the evaluation, to create Evaluation and Selection Report and to help complete all the required contract documents. Fortunately, during the final evaluation, only two bids were submitted. One bid was compliant to all requirements and the other bid was not compliant with all of the Administrative Requirements. With the background information that the previous procurement official provided me, and after scoring and evaluating the final bids submitted, I was able to generate the Evaluation and Selection Report. Before I issued the intent to award letter, I submitted the report to the evaluation team for review and approval, then to STPD management for final approval. Finally, I helped the POST procurement analyst by reviewing and completing all of the contract…

    • 905 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Gmax Holdings Company

    • 936 Words
    • 4 Pages

    The approval of Maverick 's tender does not give rise to a contract (implied or express) with the department. Most of all, no legal relationship will exist between the department and Maverick for the execution of the building of the large residential house, until a binding contract is executed by them. The department may decide to go into pre-contractual negotiations with Maverick in its absolute discretion. Maverick is bound by its Tender (Statement of compliance to the Proposed Contract forming part of Maverick 's response) to enter into the contract on the basis of the tender without…

    • 936 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Oppa Essay

    • 343 Words
    • 2 Pages

    Any contractor, who claims to have suffered loss or injury due to a breach of these procedures by the Procuring Entity, may seek a review of the specific procurement process. Notwithstanding the foregoing, it should be noted that the following are not subject to review: (i) the selection of the method of procurement and (ii) the decision by the Procuring Entity to reject all tenders, proposals, offers or quotations.…

    • 343 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Sealed bidding is a process used by the government to make its needs known through solicitation. These solicitations are called an Invitation for Bids (IFB). Sealed bids are fixed-price and are used when the contracting officer feels that adequate price competition exists and that the governments requirements are well enough defined by statement of work, specifications, and drawing for bidders to submit an educated, accurate, proposal. Sealed bids are awarded by the contracting officer to the lowest bidder, who is determined to be both responsive and responsible. Responsive bidders are those who have not taken any exception to any aspect of the contract. Responsible bidders are those who are deemed to be capable of performing and meeting the terms stated in the IFB. (Murphy, 2008)…

    • 606 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    2.What is the procurement integrity act? What are the ethical implications of the act? What is the relevance of this case?…

    • 440 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    Finch, R., 2011. NBS Guide to Tendering: for construction projects. 1st ed. Newcastle upon Tyne: NBS Publications.…

    • 1721 Words
    • 7 Pages
    Best Essays
  • Powerful Essays

    Contract Administration

    • 3153 Words
    • 13 Pages

    [ 2 ]. Phillip, Charles S. 1999 Construction Contract Administration [electronic resources] Littleton: SME 1999…

    • 3153 Words
    • 13 Pages
    Powerful Essays
  • Powerful Essays

    Arrowsmith S ' The "Blackpool" implied contract governing public sector tenders: A review in the light of Pratt and other recent case law ' (2004) 5 Public Procurement Law Review 125-131…

    • 2937 Words
    • 10 Pages
    Powerful Essays